Back to Home Page of CD3WD Project or Back to list of CD3WD Publications

CLOSE THIS BOOKWind Systems for Pumping Water: A Training Manual (Peace Corps, 1984, 93 p.)
VIEW THE DOCUMENT(introduction...)
VIEW THE DOCUMENTAcknowledgments
VIEW THE DOCUMENTIntroduction to training
VIEW THE DOCUMENTTraining guidelines
VIEW THE DOCUMENTObjectives for wind system construction training
VIEW THE DOCUMENTSession 1 Introduction and objectives
VIEW THE DOCUMENTSession 2 History of wind systems
VIEW THE DOCUMENTSession 3 Large projects and community analysis
VIEW THE DOCUMENTSession 4 Shop safety and tool care
VIEW THE DOCUMENTSession 5 Representative drawings for construction
VIEW THE DOCUMENTSession 6 Shafts and bearings
VIEW THE DOCUMENTSession 7 Strengths and testing
VIEW THE DOCUMENTSession 8 Joinery
VIEW THE DOCUMENTSession 9 Pumps and pump design
VIEW THE DOCUMENTSession 10 Siting considerations
VIEW THE DOCUMENTSession 11 Sizing wind water pumping systems
VIEW THE DOCUMENTSession 12 Design considerations for pumps and windmills
VIEW THE DOCUMENTSession 13 How to design
VIEW THE DOCUMENTSession 14 Presentation of designs
VIEW THE DOCUMENTSession 15 Construction of wind measuring poles
VIEW THE DOCUMENTSession 16 Exportation for wind sites
VIEW THE DOCUMENTSession 17 Tower raising
VIEW THE DOCUMENTSession 18 Plumbing the wind system
VIEW THE DOCUMENTSession 19 Testing installed wind system
VIEW THE DOCUMENTSession 20 Presentation of projects
VIEW THE DOCUMENTSession 21 Maintenance - preventive and routine
VIEW THE DOCUMENTBibliography
VIEW THE DOCUMENTConstruction materials list
VIEW THE DOCUMENTTool list for 24 participants
VIEW THE DOCUMENTTechnical vocabulary
VIEW THE DOCUMENTReport on the wind-powered in-service training
VIEW THE DOCUMENTRecommendations

Recommendations

THE FOLLOWING "RECOMMENDATIONS" AND "RECOMMENDATIONS AND SUGGESTIONS" WERE TAKEN FROM THE REPORT ON THE WINDMILL CONSTRUCTION IN-SERVICE TRAINING HELD IN ASUNCION, PARAGUAY, FEBRUARY 14, 1983, TO FEBRUARY 25, 1983, BY WILLIS ESCHENBACH.

In generally, this was a very successful and productive training program. There was great interest from the Paraguayans at all levels. The training was shown three times on local television. A local architect came to nearly all of the training sessions, including the construction sessions, out of his desire to be able to build a windmill on some land that he had in the country. More people were interested in taking the training than we had room for.

In addition, there was excellent support from SENASA, the National Environmental Sanitation Service. SENASA is the technical arm of the Ministro de Salud, The Ministry of Health. SENASA is the Paraguayan agency which is responsible for providing clean water to the isolated villages in the countryside. SENASA gave us the use of their shop in the nearby town of San Lorenzo for the construction phase of the training, and lent us their tools.

UNICEF has given SENASA two well drilling rigs, which SENASA has been using to install wells for small communities. Many of these communities, however, have no electricity; so SENASA has been installing hand pumps in these wells. While this is better than walking, perhaps a few miles, to get water out of a dirty creek, SENASA and the local people are interested in windmills to avoid the work involved.

UNICEF was interested enough in the training to pay 3/4 of the expenses of five of the participants.

The Servicio Forestal, the Forestry Service, is where all of the local trees have been cut down. To further this work, they maintain in partnership with the Peace Corps, nurseries to grow the trees they need. Their interest in windmills comes form the need to water their tress in. the existing nurseries and to expand the areas of the country in which they can install nurseries.

Also, the people of the town where we installed the windmill were a great help. They assisted us in the installation of the windmill, bringing stones and helping lift the tower. They also gave the final dressing to the wind pump for the inauguration, planting sod around the base, hanging flags, and putting potted flowers around the base.

Finally, there was marvelous support from Peace Corps Paraguay. The training was coordinated by Pedro Souza, the Program Manager of the Health Program. He and Joe Kyle, Coordinator for the Health Program, gave freely of their time, energy, and local expertise, especially during the week previous to the training.

SUGGESTIONS AND RECOMMENDATIONS

1. As difficult as it is, considering cultural and political influences, participating nationals should somehow be screened for their real interest in the technology and its development, and for their work habits. These programs cost time and money, and the interested people should not be hindered or distracted by non-interested, non-active students. Give their places to someone who will benefit.

2. It is important to involve local users of the windpump in the workshop. People from the community were involved, but only in the erecting and' installation of the mill. It would have been better to have at least one person from the community (in addition to their local SENASA agent, who did attend) go to all of the sessions.

3. A process is needed for selecting local people who would benefit from the IST and most of these procedures should be instituted.

4. It might be possible to encourage participation by either limiting participation to 10-12 people or by taking on a larger task (building two mills).

5. The largest difficulty with this IST concerned the installation site. The selection of this site involved political considerations, as did selection of the nationals who participated, as well as the colors each windmill should be painted. For example, two sites in a politically favored area were provided to choose between - neither of these sites were ideal. One of the sites was marginal and the other was poor given the considerations listed in this manual.

Probably what we should have done at that point was to say, "Sorry, neither of these sites will do." Instead, what we said was, "Well, as long as you understand that this is a marginal site and the wind system may not work here, we'll put it in." They said "Yes," they understood, and we went on from there. The situation was complicated by the fact that we told them that it would require a 1-3/4 inch pump to go to the depth of that well (165 feet). They said they had one that they would install, but when push came to shove all they had was a 2-inch pump, too large for that depth.

The outcome was that the mill worked; however, not as well as it should have. It worked and people were happy with it, but it is definitely a marginal installation.

First impressions count for a lot. Introduction of a ''new" technology - even if it is a proven system - can fail if the first steps are weak. In this case the steps have been strong enough, but marginally so. For success in the future the minimum standards for the site should be:

a. That it provide for a basic need of an interested community.

b. That it be a very good wind site.

c. That the site be easily accessible by people from out of the area - high visibility.

6. Tables in the manual could be arranged in a simpler form.

SCHEDULE OF PARAGUAY WINDMILL CONSTRUCTION TRAINING
2/14/83 - 2/25/83


Monday 14

Tuesday 15

Wednesday 16

Thursday 17

Friday 18

8:00

Intro. to

Siting considerations

Shop Safety/Strength

Construction

Construction

:

Training

Measuring

of Materials



:


the Wind




10:00






10:20

Introduction

Maintenance

Construction

Construction

Construction

:






12:00






2:00

Pumps, Shafts

Water and Numbers

Construction

Construction

Construction

:

& Bearings





4:00






4:20

Design

Plans of this

Construction

Construction

Construction

:

Considerations

Windmill




6:00







Monday 21

Tuesday 22

Wednesday 23

Thursday 24

Friday 25

8:00

Field Trip

Construction

Taking the Mill

Assembly of Mill

Off

:

Construction


to the Site



10:00






10:20

Construction

Construction

Digging Holes

Assembly of Mill

Off

:



for Tower



12:00






2:00

Construction

Construction

Digging Holes

Assembly of Mill

Wrap-up and

:





Evaluation

4:00






4:20

Construction

Construction

Erecting the

Assembly of Mill

Inauguration

:



Tower


and Closure

6:00






Since 1961 when the Peace Corps was created, more than 80,000 U.S. citizens have served as Volunteers in developing countries, living and working among the people of the Third World as colleagues and co-workers. Today 6000 PCVs are involved in programs designed to help strengthen local capacity to address such fundamental concerns as food production, water supply, energy development, nutrition and health education and reforestation.

Peace Corps overseas offices:

BELIZE
P. O. Box 487
Belize City

BENIN
BP 971
Cotonou

BOTSWANA
P. O. Box 93
Gaborone

BURKINA FASO
BP 537 - Samand in Ouagadougou

BURUNDI
c/o American Embassy
Bujumbura

CAMEROON
BP 817
Yaounde

CENTRAL AFRICAN REPUBLIC
BP 1080
Bangui

COSTA RICA
Apartado Postal 1266
San Jose

DOMINICAN REPUBLIC
Apartado Postal 1414
Santo Domingo

EASTERN CARIBBEAN
Including: Antigua, Barbados, Grenada, Montserrat, St. Kitts-Nevis, St. Lucia, St. Vincent, Dominica "Erin Court"
Bishops Court Hill
P. O. Box 696-C
Bridgetown, Barbados

ECUADOR
Casilla 635-A
Quito

FIJI
P. O. BOX 1094
Suva

GABON
BP 2098
Libreville

GAMBIA, The
P. O. Box 582
Banjul

GHANA
P.O. Box 5796
Accra (North)

GUATEMALA
6a Avenida 1-46
Zona 2
Guatemala

HAITI
c/o American Embassy
Port-au-Prince

HONDURAS
Apartado Postal
C-51
Tegucigalpa

JAMAICA
Musgrove Avenue
Kingston 10

KENYA
P. O. Box 30518
Nairobi

LESOTHO
P. O. Box 554
Maseru

LIBERIA
Box 707
Monrovia

MALAWI
Box 208
Lilongwe

MALI
BP 85
Box 564

MAURITANIA
BP 222
Nouakchott

MICRONESIA
P. O. Box 336
Saipan, Mariana Islands

MOROCCO
1, Zanquat Benzerte
Rabat

NEPAL
P. O. Box 613
Kathmandu

NIGER
BP 10537
Niamey

PAPUA NEW GUINEA
P.O. Box 1790
Boroko
Port Moresby

PARAGUAY
c/o American Embassy
Asuncion

PHILIPPINES
P. O. Box 7013
Manila

RWANDA
c/o American Embassy
Kigali

SENEGAL
BP 254
Dakar

SEYCHELLES
BP 697
Victoria

SIERRA LEONE
Private Mail Bag
Freetown

SOLOMON ISLAND
P. O. Box 547
Honiara

SRI LANKA
50/5 Siripa Road
Colombo 5,
Sri Lanka

SWAZILAND
P. O. Box 362
Mbabane

TANZANIA
Box 9123
Dar es Salaam

THAILAND
42 Soi
Somprasong 2
Petchburi Road
Bangkok 4

TOGO
BP 3194
Lome

TONGA
BP 147
Nuku' Alofa

TUNISIA
BP 96
1002 Tunis - Belvedere
Tunis

WESTERN SAMOA
P. O. Box 880
Apia

YEMEN
P. O. Box 1151
Sana'a

ZAIRE
BP 697
Kinshasa

TO PREVIOUS SECTION OF BOOK